The record moves in three steps. Crews capture the work in the field, the capture becomes one connected record, and that record produces the reports and feeds the systems your agency already runs. On this page you’ll see how each step works, what makes it different, and what to ask us to show you.

1 · How the record moves

Capture in the field. Connect it once. Report from it everywhere.

CAPTURE

In the field, with or without signal

Inspectors, samplers and bridge crews work on iPad and iPhone. Each entry is saved on the device and syncs when there’s a connection.

  • Photos, video, notes and weather, stamped with time and location
  • Quantities recorded against the contract’s bid items
  • Samples labeled with QR codes at the point of collection
  • Bridge elements rated on pre-filled inspection forms

Used by inspectors, samplers, bridge inspectors

RECORD

One connected record

Nothing is filed in a folder. Every entry is linked to the project, the bid item and the day, and to whatever it becomes next.

  • Observations roll into the daily report
  • The resident engineer reviews and approves in one queue
  • Approved quantities feed pay estimates and change orders
  • Test results are checked against spec tolerances as they’re entered
  • RFIs, submittals and punch lists stay tied to the work they’re about

Used by resident engineers, project managers, lab staff

REPORT

Reports and your systems of record

The record produces what your agency files, and it feeds the systems you already run.

  • Daily reports and forms in your agency’s own format
  • Pay estimates, lab reports and program dashboards
  • Exports and integrations to your system of record
  • Read-only access for contractors, sponsors and auditors

Used by contract administrators, program managers, auditors

2 · From award to closeout

One project, six records running side by side.

Materials work starts before the first crew arrives. Payment and changes outlast the work. The record outlasts everything.

Six records across the seven stages of a projectMaterials runs from award to closeout. The daily record runs from field work to completion. Quantities and pay, and changes and time, run from field work to closeout. Funding runs from award to closeout. Labor and compliance run from award to closeout in the agency’s own program, connected to HeadLight.repeats every pay periodAWARDFIELD WORKPAY PERIODQUALITYCHANGESCOMPLETIONCLOSEOUTMaterialssources, sample plan, testsApproved sources and mixes → samples and tests → lots accepted → materials certificationDaily recordwhat happened, every dayDaily reports, photos, crews, weather, the project diaryQuantities and paymeasured, approved, paidQuantities → working days → pay estimates → final quantities and final estimateChanges and timeauthorized, recorded, pricedField event → authorization → extra work recorded → change orderFundingwhere the dollars come fromAllocated → encumbered as contracts and changes flow → closed outLabor and compliance programpayrolls, DBE, prompt payYour labor-compliance program, connected to HeadLight
Field DataMaterialsFundingConnected

Stages as most state DOTs and local agencies run them. Names and forms vary by agency; the shape doesn’t.

3 · Follow one record

Follow one observation from the inspector’s photo to the audit.

This is the record in practice. A deck pour is captured once on site, becomes part of the daily report, is approved, paid, and answered for at audit, with branches to the lab and the project team along the way. Nothing is re-keyed at any step.

Example: deck pour, span 2 · Project 24-118

One record · five uses
  1. Tue 7:42 AMOn site
    Observation
    07:42 · GPS
    Deck pour, span 2
    39.7392, −104.9903
    Tue 07:42:18
    Structural concrete38.5 CY
    Offline · will sync

    01The inspector captures it once — with or without signal.
    Field Data Management

    Branch · materials
    Sample 24-118 → Test → Within spec
    Materials
  2. Tue 3:10 PMDaily report
    Daily report · Tue
    3 observations
    Traffic control set06:55
    Deck pour, span 207:42
    Curing blankets placed13:20
    Weather, crew and photos attached
    Submit

    02The daily report assembles itself from the day’s observations.
    Field Data Management

  3. Wed 9:05 AMRE approval
    Approval queue
    Tue · Deck pourApproved
    Tue · PavingReview
    Structural concrete · 38.5 CY
    Locked to 1 observation, 4 photos

    03The resident engineer reviews and approves — the quantity is now locked to the evidence.
    Field Data Management

    Branch · project team
    RFI 031 → Answered → Submittal Approved
    Field Data Management
  4. Month endPay estimate
    Pay estimate · No. 7
    Bid itemThis period
    Structural concrete38.5 CY
    from 1 approved daily
    Source: field record

    04The pay estimate pulls approved quantities. No re-keying.
    Field Data Management

  5. 18 months laterAudit
    Search project record

    05An auditor asks. You answer with one search.
    Funding

Illustrative product view · example dataSame record at every step

Field observations power every form and workflow.

Everyone on site records what they see. Those observations fill the forms, and the workflows carry them to the work each area does. Follow any line in either direction.

Field observations (photo and note, quantity placed, sample taken, question or issue, element condition) feed four forms and workflows: the daily report and its approval, the sample card and lab intake, the RFI and submittal review, and the inspection form and its review. Those reach the office, the lab, the project team and the asset, and every link runs both ways.FIELD OBSERVATIONSFORMS AND WORKFLOWSTHE WORK THEY REACHPhoto and noteQuantity placedSample takenQuestion or issueElement conditionDAILY REPORT→ approval workflowThe officePay estimates, change ordersSAMPLE CARD→ lab intake and testingThe labTest results, acceptanceRFI AND SUBMITTAL→ review and answer routingThe project teamAnswers, punch list, closeoutINSPECTION FORM→ review and schedulingThe assetElement ratings, inspection historyThe same photo can feed the daily report, an RFI and an inspection: captured once, used everywhere.
Field observations
Photo and noteQuantity placedSample takenQuestion or issueElement condition
Daily report → approval workflowThe office: Pay estimates, change orders
Sample card → lab intake and testingThe lab: Test results, acceptance
RFI and submittal → review and answer routingThe project team: Answers, punch list, closeout
Inspection form → review and schedulingThe asset: Element ratings, inspection history

The same photo can feed the daily report, an RFI and an inspection: captured once, used everywhere.

4 · How configuration works

Your administrators set it up, without code. We build what’s genuinely unique.

Every agency runs the same kind of program. What differs is names, thresholds, approval levels and forms, and those are settings, not code. Each edition says who sets them up, so nobody bends the process around the software or keeps a spreadsheet on the side.

Essentials

Standard

Start on HeadLight’s standard forms and workflows, the same day.

Pro

Configured, without code

Your administrators set up forms, rules, reports and approvals to your standards.

Custom

Engineered with you

We build what is genuinely unique to your program: forms, data and integrations.

A paper form, rebuilt

Your administrators turn one of your forms into a HeadLight form, with your agency’s fields and conditional logic, without a developer.

Ask us to show youOne of your current paper forms, rebuilt as a HeadLight form.

A testing schedule for one project

Sample plans start from your spec year’s template and are adjusted per project. Acceptance rules and tolerances follow your spec.

Ask us to show youA testing schedule built from a spec year’s template, then adjusted for a single project.

Approvals the way your agency signs

Multi-level routing with escalation rules, from the inspector to the resident engineer and on to the district.

Ask us to show youAn approval chain with an escalation rule, set up while you watch.

31,600+ projects in 25+ states run on HeadLight today, from single contracts to agency-wide programs.

5 · Built from the same parts

Every solution runs on the same forms, workflows and dashboards.

Field Data Management, Materials, Funding and Assets aren’t separate products stitched together. They share three building blocks, so what you set up once works everywhere, and every number on a dashboard opens to the record behind it.

Forms

Your forms, filled from the field

Dailies, inspections, sample cards and your agency’s own forms, with your fields and logic.

  • SmartForms on iPad, iPhone and the web
  • Filled from everyone’s observations, not retyped
See a form fill from many hands
Workflows

Approvals the way your agency signs

Routing from the inspector to the resident engineer and on to the district, with escalation rules.

  • One approval queue per person
  • Every step on the record
Dashboards

The whole program, live, from the field record

Built on the same records the forms create, so nobody exports to a spreadsheet to see where things stand.

  • Set up by configuration, not code
  • Each tile opens to the records behind it

An agency program dashboard, for example. Every audience works from its own: agencies, CEI firms, contractors and producers and labs.

Illustrative product view · example data

6 · How HeadLight is different

One record from the jobsite to the audit, kept as data, shared across every organization on the job.

The work is captured once in the field and linked from the observation to the payment, for the agency, its CEI firms, contractors and labs alike. Here’s why that’s rare, and how to check it.

They store documents, not data.

When the daily report is a PDF, the quantity inside it has to be typed again for the estimate, the lab and the audit. HeadLight keeps every observation as data, linked to what it becomes next.

They stop at one organization’s walls.

Most tools are built for the contractor, or for the agency. The work that matters happens in the hand-offs between them, and that’s where HeadLight’s record lives.

They make public work fit a generic form.

Spec years, pay items and agency formats are local. When software can’t hold them, people re-key into spreadsheets. HeadLight is configured to them.

Three more differences, and how to check each one in a walkthrough.

Every vendor says “connected” and “easy to use”, so we won’t ask you to take our word for it. For each difference below, there’s something specific to ask us to show you.

Built for public-infrastructure inspection

General construction apps were built for contractors on building sites. HeadLight was built around how public work is inspected and paid for: bid items, the daily report, sample plans by spec year and element-level bridge inspection.

Ask us to show youA daily report produced in your agency’s format, from a morning of observations.

One record across four kinds of work

Field data, materials, funding and asset inspection share one record. Nobody re-keys work from one system into the next.

Ask us to show youA pay estimate line opened back to the photos, the daily report and the approval behind it.

Works where inspectors actually are

Capture works offline and syncs when the device reconnects. Time and location are stamped automatically, so the evidence is there even when the signal isn’t.

Ask us to show youAn iPad in airplane mode capturing a morning’s work, then syncing.

Questions to ask any vendor

Put the same questions to every system you’re considering. Each is something we’ll do in a walkthrough.

  1. Open a line on last month’s pay estimate. Show me the photo and the daily report behind it.
  2. Show me a test result tied to its sample, its lot and the person who pulled it.
  3. Rebuild one of our paper forms while I watch, without a developer.
  4. Turn off the iPad’s signal and capture a morning’s work.
7 · Where HeadLight fits

Your systems of record run the program. HeadLight keeps the field record underneath.

Most agencies already run planning systems, a PMIS or e-construction system, and document management. Each works at its own altitude. HeadLight works at the level of the observation, the sample and the RFI, captured once and connected to the office, the lab, the project team and the asset.

The life of an assetWhere each kind of system does its work.

HeadLight doesn’t replace the others; it feeds them. The system of record runs the program, document management keeps the files, and HeadLight keeps what actually happened in the field. It starts at construction and carries on through inspections for the life of the asset.

The grain of the recordProgram systems see totals. The field happens one observation at a time.
LevelExampleSystem of recordDocsHeadLight
ContractContract 24-118, bridge replacement
Pay item0509 Structural concrete, 412 CY to date
Daily reportTue 14 Oct
RFI & submittalRFI 031, deck drain detail, answered
Observation07:42 · STA 13+50 · deck pour, span 2 · 38.5 CY · 58°F · photo
Sample & testCylinder set 07 · 7-day break
structured and linkedsummary, typed in after the facta file, not datanot held
Ask the recordWhy the grain matters, now that AI is reading the data.

A question an auditor asksWhich deck pours placed below 50°F had low 7-day breaks, who approved them, and were they paid?

  • Document managementReturns a stack of daily-report PDFs to read.
  • System of recordKnows 412 CY of concrete was paid, not which pour, the temperature or the break.
  • HeadLightAnswers from linked records: each pour with its photos, breaks, approvals and the estimate lines that paid it.

AI-ready means granularAI can’t reason over a scanned daily or a monthly total. HeadLight keeps every observation structured, located, timed and linked, so your dashboards and AI tools can answer questions like this.

Illustrative example.

8 · Your other systems

One record, connected to the systems you already run.

HeadLight captures and proves the work in the field, the plant and the lab. It connects to the systems you already run through imports and exports, and to any system that can call or be called by a REST API.

Show systems for

Example connections and workflows

Pre-construction system of record

Agencies

In The bid package in, as trackable line items

The state’s materials office

Materials producers

Out Daily QC submittals and source approvals, on the state’s forms

Asset and bridge management

Agencies

Both ways Your inventory in from your legacy system; field inspection data back out to it

Mix design approval

Materials producers

Both ways The state’s packet out, the approved JMF back as your target

Finance and civil rights

Agencies

Both ways Funding, payments and the field record for DBE

Your current lab system

Materials producers

Both ways A live connection with your existing lab system: samples out, results in, plus push-button import of your history

HeadLight platform

  • A modern REST API for reading and writing your records
  • Webhooks and events when records change
  • Push-button import of existing data from legacy systems
  • Submittals on the state’s forms; exports in your agency’s formats
  • A synchronized copy of every record in your own environment
  • Single sign-on and directory sync (SSO, SAML, SCIM)

Lab systems

Agencies

Both ways A live connection with your existing lab system: samples out, results in

Your plant and scale systems

Materials producers

In Batch, blend and ticket data, into the production record

Documents and design files

Agencies

Both ways Plans and specs in; approved documents out to your document management system

Your ERP and accounting systems

Materials producers

Both ways Integrations with your ERP and accounting systems

Reporting and your data

Agencies

Out Every record, synced to your own environment

Reporting and your data

Materials producers

Out Every record, synced to your own environment

9 · Your data, your AI

You decide how AI is used with your data.

The AI assistant you choose

Connect the AI assistant you choose through the MCP connector. You decide how AI is used with your data.

Faster configuration

HeadLight uses AI to speed up configuration of projects, forms, reports and outputs, so your setup matches your project fast.

Configuration, not your data

AI helps you configure. It doesn’t change your data or interpret your inputs.

10 · Security and your data

Your data is yours, kept separate from other customers’, and visible only to the right people.

Kept apart by design

Each customer’s data is stored separately. Permissions apply at the record level, so people see only the projects and records their role allows.

Yours to take with you

You can download your data at any time. LiveConnect keeps a synchronized copy in your own environment.

Deployed your way

Cloud-hosted as standard. Single sign-on and dedicated or on-premises deployment are available for large programs.

11 · Getting started

Start with the standard setup, or configure it to your standards.

EssentialsThe same day to a few days

HeadLight’s standard forms and workflows. Self-guided onboarding.

ProTypically 2–4 weeks

Your forms, approval chains and connectors, configured with guided onboarding.

CustomScoped with you

Integrations, custom deployment and a named success manager for large programs.

Pricing is quoted per user, on an annual term, based on the solutions and edition you choose.

See it on a morning’s work, in 20 minutes.

A HeadLight specialist walks you through capture, approval and reporting for the work you do.